Long-leaded 1-W LED enables
easy board integration
Low-profiler device mounts flat to surface without modification
Provided with longer leads than its predecessor, the OVTL01LGAxS Lednium Series 1-W LED can mount flat on the PCB without indentation of the board surface. Features include a dc forward current of 0.35 A (1 A peak) with a typical forward voltage from 2.0 to 3.3 V (color-dependent) and a reverse voltage of 5 V.
Available in amber, blue, green, and red as well as 7,000K and 5,500K white, the 6.0 x 5.1 x 1.6-mm LED has a 140° viewing angle. With a thermal resistance of 2°C/W, the device has a maximum junction temperature of 130°C and an operating temperature range from –50° to 85°C. (From $1.30 ea/10,000�stock to 10 weeks ARO.)
OPTEK Technology
Carrollton, TX
Information 972-323-2200
http://www.optekinc.com
Advertisement





