For most industries, the accepted norm for unplanned downtime is 5% of operating time, which represents a direct, significant loss of revenue and therefore
It's only a circuit breaker. Yet there is enough complexity and confusion when it comes to specifying circuit protection that many engineers are designing equipment with
This application note describes how a customer ised the TEGAM Model 1750 High-Speed Programmable Microohmmeter to control the silver plating thickness od copper wire in